X
    Categories: Music

A Temporary, Prefab Concert Hall At A Disused Power Plant On The Edge Of Town — Can It Work?

That’s what they’re hoping for in Munich, where the Gasteig has closed for a multiyear renovation. Both the city’s orchestra’s will be performing at the Isarphilharmonie, assembled for only $46 million but custom-designed with (very successful) acoustics by Yasuhisa Toyota. – The New York Times Read entire story.

Source: MUSIC – ArtsJournal

admin :